Sector | End-User | Systems | Project / Application |
Oil & Gas |
 |
DCS/ESD/F&G |
Application |
Oil Terminal (in progress) |
Project |
Design, installation, commissioning and maintenance of CCS comprising DCS, ESD, F&G systems for the plant comprising tank farm, truck loading and jetty. |
|
Oil & Gas
|
 |
DCS/ESD/F&G |
Application |
Gas Compressor Station (High Pressure Natural Gas Pipeline) |
Project |
DCS, ESD, PSD and Gas Detection System, integrated with Compressor Controller, Electrical System, Flow Computer sub-systems as well as with the SCADA of the National Transmission System of natural gas for remote operation. |
|
Oil & Gas |
 |
DCS |
Application |
Process units of Oil refinery FCC, MCH, CCR, CDU/VDU, HDS, SRU, etc. |
Project |
Implementation of DCS expansion and migration projects for plant wide, multi-generation control system. |
|
Oil & Gas |
 |
DCS |
Application |
Utilities units of Oil Refinery |
Project |
Upgrade of refinery Utilities units from Conventional control to DCS. Hot transfer of monitoring and controls during refinery operation. |
|
Power
|
 |
SCADA |
Application |
Lignite Fired Power Plant |
Project |
Deployment of Event Recording System |
|
Oil & Gas
|
 |
DCS |
Application |
Isomerization Unit of Oil Refinery
|
Project |
DCS and ESD for upgrade/conversion of existing Isomerization Unit. |
|
Oil & Gas |
 |
DCS |
Application |
Process Units of Oil Refinery |
Project |
Replacement of DCS and integration of conventional control panels and systems into a new DCS |
|
Power |
 |
CEMS |
Application |
Stack (gasses) of Lignite fired power plants |
Project |
Design, installation, commissioning and maintenance of Continuously Emission Monitoring Systems (CEMS) for 17 units at four (4) Lignite Fired Power Plants. |
|
Oil & Gas |
 |
DCS / ESD |
Application |
Sulfur Recovery Unit of Oil Refinery |
Project |
DCS and ESD for new Sulfur Recovery Unit |
|
Industrial Gas
|
 |
DCS |
Application |
Gasification plant |
Project |
TCB supported the deployment of initial system and executed the migration of DCS during a short plant shutdown. |
|
Chemical |
 |
DCS |
Application |
PET plant |
Project |
TCB supported the deployment of initial system and executed the migration of DCS during a short plant shutdown. |
|
Power |
 |
SCADA |
Application |
Oil Fired Power Plant |
Project |
Deployment of Event Recording System |
|
Oil & Gas |
 |
DCS |
Application |
LNG Terminal |
Project |
TCB supported the deployment of initial system and maintains the system. |
|
Oil & Gas |
 |
SCADA |
Application |
Kerosene JA1 Pipeline (53km) between Hellenic Petroleum refinery and Athens International Airport |
Project |
Replacement of existing SCADA and telecommunication system. Including integration into refinery DCS and leak detection system |
|
Oil & Gas |
 |
DCS |
Application |
Waste Treatment unit at Oil Refinery |
Project |
Upgrade from conventional control to DCS. Hot transfer of monitoring and controls during unit operation. |
|
Pharma-
ceutical
|
 |
SCADA |
Application |
Pharmaceutical production plant |
Project |
Data Acquisition System |
|
Oil & Gas |
 |
DCS / ESD |
Application |
Process Unit of Oil Refinery |
Project |
Upgrade of plant automation from pneumatic control to DCS through replacement and conversion of field instrumentation and deployment of DCS |
|
Oil & Gas |
 |
SCADA |
Application |
Crude oil pipeline (213km) between Thessaloniki and Skopje |
Project |
Design, installation, commissioning and maintenance of SCADA system crude oil pipeline. System comprising SCADA, ESD, telecommunication and Leak Detection Systems. |
|
Oil & Gas |
 |
DCS |
Application |
Oil Movement at Oil Refinery |
Project |
Support of the implementation of Blend Property Controller for Gasoline and GasOil Blenders |
|
Oil & Gas |
 |
DCS |
Application |
Process Units – FCC, MHC |
Project |
Support of the implementation of Advanced Process Control |
|
Oil & Gas |
 |
SCADA |
Application |
Utilities Boilers at Oil Refinery |
Project |
Conventional Control Panel for new Utility Boilers |
|
Oil & Gas |
 |
SCADA |
Application |
High pressure pipeline for natural gas |
Project |
Migration of the SCADA system of the Hellenic transmission system of natural gas. |
|
Power |
 |
SCADA |
Application |
Two (2) 350MW Lignite Fired Power Plant. |
Project |
Upgrade of 1st generation automation system to DCS Services included the system hardware replacement, instrumentation replacement, loop check and start-up support. |
|
Oil & Gas |
 |
SCADA |
Application |
High pressure pipeline for natural gas |
Project |
SCADA system for the Hellenic transmission system of natural gas. Deployment of SCADA and RTU's installed at Metering/Reduction Stations, Line Valve Stations and Border Station. |
|
Power |
 |
DCS |
Application |
District Heating Plant |
Project |
Deployment of initial system, expansion of the system as part of plant upgrade and execution of the migration of DCS. |
|